Why Choose Us |
|
★ Passion |
★Short lead time |
★24/7 Support |
★Personel and focused on customer |
★Efficient |
★Quality |
★Reliabile |
★Responsible |
★Flexible |
★Experienced |
★Product Description★
CIPP inversion method hot water curing repair technology:
The inversion method uses air or water to deliver resin-coated hoses into underground pipes by inversion. This method allows for quick and easy feeding of materials. The hose is heat-hardened to form a high-strength lined new pipe within an existing pipe.
CIPP drag-in UV repair technology:
The UV light curing method uses the dragging method to drag the material hose into the underground pipeline. After hardening by UV-curing technology, a new lined pipe is formed in the existing pipe. This method requires a lot of pulling force when the material hose is pulled in, and generally pre-lays the mulch in the pipeline, and then implements the construction.
Construction process:
1. Pull in (before pulling in the lined hose) the protective film of the lined hose
2. Pull in the lined hose